{"id":5680,"date":"2024-07-17T14:41:33","date_gmt":"2024-07-17T06:41:33","guid":{"rendered":"https:\/\/www.regalstoneworks.com\/?p=5680"},"modified":"2024-12-11T14:48:11","modified_gmt":"2024-12-11T06:48:11","slug":"decorazione-in-pietra-14-diagrammi-dettagliati-dei-nodi-strutturali-per-unanalisi-approfondita","status":"publish","type":"post","link":"https:\/\/www.hcenturystar.com\/it\/stone-decoration-14-detailed-structural-node-diagrams-for-in-depth-analysis\/","title":{"rendered":"14 costruttori dettagliati per la decorazione in pietra"},"content":{"rendered":"<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Metodo di posa a secco della pietra<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"1012\" height=\"721\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5687\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction.png 1012w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction-300x214.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction-768x547.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction-600x427.png 600w\" sizes=\"auto, (max-width: 1012px) 100vw, 1012px\" \/><\/a><figcaption class=\"wp-element-caption\">1. Realizzazione di una posa a secco nella decorazione in pietra<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazioni in pietra di spazi pubblici come sale interne e sale ascensori.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flusso del processo<br>Posizionare la linea di controllo \u2192 disposizione delle lastre di pietra \u2192 predisporre la pietra \u2192 inserire i tasselli di espansione \u2192 installare la struttura in acciaio \u2192 installare la lamiera di regolazione \u2192 incasso per pietra \u2192 posa della pietra \u2192 trattamento sigillante per pietra<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave per la decorazione in pietra<br>1) Tutte le specifiche dell'acciaio rispettano gli standard nazionali; le parti zincate a caldo e saldate sono protette dalla ruggine. La qualit\u00e0 dell'acciaio per pendenti in pietra in acciaio inossidabile \u00e8 202 o superiore, e per progetti costieri sono necessari accessori di connessione in acciaio 304.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Lo spessore della pietra deve essere superiore a 20 mm. Per pareti alte entro 2500 mm, \u00e8 necessario utilizzare profilati in acciaio a canale 5# verticalmente e angolari 40mm\u00d740mm orizzontalmente. La distanza viene determinata in base alla disposizione delle giunzioni orizzontali della pietra.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3) Per pareti alte oltre 2500 mm, \u00e8 necessario utilizzare profilati in acciaio a canale 8# verticalmente e angolari 50mm\u00d75mm orizzontalmente. La distanza viene determinata in base alla disposizione delle giunzioni orizzontali della pietra.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Disposizione a forma di U delle giunzioni della pietra muraria<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"671\" height=\"821\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5688\" style=\"width:413px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone.png 671w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone-245x300.png 245w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone-600x734.png 600w\" sizes=\"auto, (max-width: 671px) 100vw, 671px\" \/><\/a><figcaption class=\"wp-element-caption\">Disposizione a forma di U delle giunzioni della pietra muraria<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Sale interne, sale ascensori, bagni e altre pareti.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>Le giunzioni orizzontali delle pareti in pietra devono essere disposte secondo l'altezza della linea d'occhio umana.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">L'angolo esterno della pietra muraria \u00e8 chiuso<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"564\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-1024x564.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5697\" style=\"width:586px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-1024x564.png 1024w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-300x165.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-768x423.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-600x330.png 600w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed.png 1088w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">L'angolo esterno della pietra muraria \u00e8 chiuso<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Sale interne, sale ascensori, bagni e altre pareti.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>1) Gli angoli esterni della pietra muraria devono essere giuntati diagonalmente a 45\u00b0;<br>2) Dopo aver posato tutte le pietre murali, occorre preparare colla di marmo dello stesso colore della pietra per il giunto, e il giunto deve essere ben sigillato.<br>3) Gli angoli esterni della pietra muraria vengono lavorati secondo le esigenze di progettazione.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Gli angoli interni della pietra muraria<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"996\" height=\"653\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5689\" style=\"width:508px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone.png 996w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone-300x197.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone-768x504.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone-600x393.png 600w\" sizes=\"auto, (max-width: 996px) 100vw, 996px\" \/><\/a><figcaption class=\"wp-element-caption\">Gli angoli interni della pietra muraria<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Sale interne, sale ascensori, bagni e altre pareti.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>Quando sulla parete in pietra ci sono giunzioni orizzontali (come giunzioni a V e scanalature), gli angoli interni devono essere a 45\u00b0 (l'angolo \u00e8 leggermente inferiore a 45\u00b0 per facilitare la giunzione) e devono essere lavorati in fabbrica.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Porta di ispezione per pietra<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"696\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-1024x696.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5690\" style=\"width:484px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-1024x696.png 1024w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-300x204.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-768x522.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-600x408.png 600w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door.png 1030w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Porta di ispezione per pietra<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Sale interne ascensori, hall, corridoi, ecc.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>1) Per porte nascoste in pietra \u00e8 necessario utilizzare angolari in acciaio zincato a caldo. Le dimensioni degli angolari e dei cuscinetti a sfera vengono selezionate in base al peso morto del corpo della porta, e le parti saldate sono trattate con antiruggine;<br>2) Le superfici tagliate della pietra, i bordi della porta e i bordi della cornice devono essere lucidati quando la pietra viene appesa o installata, e la superficie della cornice in acciaio \u00e8 sigillata con pannello impermeabile;<br>3) Per evitare che la porta urti contro la cornice danneggiando la pietra, \u00e8 necessario installare una catena di limitazione tra porta e cornice.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Installazione della vasca con cornice in acciaio<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><br>Applicabile a<br>decorazione in pietra Vasche da bagno a incasso.<br>Flusso del processo<br>Disposizione \u2192 Installazione delle tubazioni \u2192 Saldatura della cornice di base \u2192 Fissaggio della cornice di base alla parete \u2192 Lavorazione in fabbrica della pietra \u2192 Fissaggio della vasca \u2192 Installazione sul posto<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"832\" height=\"791\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5691\" style=\"width:553px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation.png 832w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation-300x285.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation-768x730.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation-600x570.png 600w\" sizes=\"auto, (max-width: 832px) 100vw, 832px\" \/><\/a><figcaption class=\"wp-element-caption\">Installazione della vasca con cornice in acciaio<\/figcaption><\/figure>\n<\/div>\n\n\n<ol class=\"wp-block-list\" start=\"6\">\n<li><\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>1) La cornice in ferro della vasca deve utilizzare angolari zincati secondo gli standard nazionali, e le parti saldate devono essere protette dalla ruggine;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Per facilitare lo smontaggio e la manutenzione della vasca, la vasca \u00e8 fissata sul componente fisso, e il componente fisso e il supporto in pietra sono fissati con bulloni in acciaio inossidabile o zincati. La parte posteriore del supporto e la parte posteriore del piano di lavoro devono essere rugose e fissate con colla per marmo. La connessione tra la vasca e il componente fisso deve essere realizzata con guarnizioni in gomma, e la vasca e il bordo inferiore del piano di lavoro sono sigillati con colla resistente agli agenti atmosferici.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Installazione della vasca da banco sotto-piano<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"675\" height=\"782\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5692\" style=\"width:433px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation.png 675w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation-259x300.png 259w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation-600x695.png 600w\" sizes=\"auto, (max-width: 675px) 100vw, 675px\" \/><\/a><figcaption class=\"wp-element-caption\">Installazione della vasca da banco sotto-piano<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Sale interne, sale ascensori, bagni e altre pareti.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flusso del processo<br>Disposizione \u2192 Installazione delle tubazioni \u2192 Produzione in fabbrica della cornice in legno \u2192 Lavorazione in fabbrica della pietra \u2192 Fissaggio della vasca \u2192 Installazione combinata<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>Per facilitare lo smontaggio e la manutenzione della vasca, la vasca \u00e8 fissata sul componente fisso, e il componente fisso e la superficie inferiore dell'armadio sotto-piano sono fissati con viti da 8mm. La connessione tra la vasca e il componente fisso deve essere sigillata con guarnizioni in gomma, e il bordo inferiore della vasca e il piano di lavoro sono sigillati con colla resistente agli agenti atmosferici.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Intersezione tra parete in marmo e divisorio in vetro del bagno<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"547\" height=\"718\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5693\" style=\"width:438px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall.png 547w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall-229x300.png 229w\" sizes=\"auto, (max-width: 547px) 100vw, 547px\" \/><\/a><figcaption class=\"wp-element-caption\">Intersezione tra parete in marmo e divisorio in vetro del bagno<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Bagno, doccia, divisorio in vetro, ecc.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>1) Prima di installare il vetro della doccia, inserire una scanalatura in acciaio inox a forma di \u201cU\u201d tra due pezzi di pietra e fissarla con colla AB o colla per marmo, inserire il vetro nella scanalatura e applicare silicone trasparente anti-muffa sulla giunzione;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Il diametro interno dell'acciaio inox a forma di U \u00e8 2-4mm pi\u00f9 grande dello spessore del vetro, profondo 15mm\u201318mm, e lo spessore della parete non \u00e8 inferiore a 1,2mm;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3) Il vetro deve essere bordato su tutti i lati.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Installazione delle parti integrate per porte della doccia<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"845\" height=\"746\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5694\" style=\"width:474px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors.png 845w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors-300x265.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors-768x678.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors-600x530.png 600w\" sizes=\"auto, (max-width: 845px) 100vw, 845px\" \/><\/a><figcaption class=\"wp-element-caption\">Installazione delle parti integrate per porte della doccia<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Bagno e doccia.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>Quando si installa la porta della doccia nel bagno, \u00e8 necessario integrare la barra di ferro prima di installare la pietra e fissarla direttamente alla parete (la parete aerata riempita di sabbia deve essere rinforzata con barre filettate passanti).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Costruzione della nicchia nel bagno<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"844\" height=\"745\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5695\" style=\"width:452px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction.png 844w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction-300x265.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction-768x678.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction-600x530.png 600w\" sizes=\"auto, (max-width: 844px) 100vw, 844px\" \/><\/a><figcaption class=\"wp-element-caption\">Costruzione della nicchia nel bagno<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Costruzione di pareti, pietre e piastrelle in bagni e cucine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>L'altezza della nicchia nel bagno deve essere determinata in base alla disposizione della pietra o delle piastrelle murali. L'altezza deve essere allineata con la giunzione orizzontale, e deve essere realizzato lo stesso smusso o scanalatura della giunzione orizzontale.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Costruzione di chiusura della pietra per vasca da bagno 01<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"943\" height=\"617\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5696\" style=\"width:593px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01.png 943w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01-300x196.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01-768x502.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01-600x393.png 600w\" sizes=\"auto, (max-width: 943px) 100vw, 943px\" \/><\/a><figcaption class=\"wp-element-caption\">Costruzione di chiusura della pietra per vasca da bagno 01<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Bagni.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flusso del processo<br>Disposizione \u2192 Saldatura e installazione della cornice in ferro angolare \u2192 Installazione della rete metallica \u2192 Pitturazione con malta cementizia \u2192 Installazione della pietra \u2192 Installazione della vasca da bagno<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>1) La giunzione tra la vasca da bagno e la pietra viene realizzata secondo il metodo di pressione della pietra sul bordo della vasca. Il piano di lavoro in pietra viene tagliato secondo le dimensioni della vasca, scavato e bordato. Dopo la lavorazione in fabbrica, viene installato sul posto. La giunzione tra la pietra e la vasca da bagno \u00e8 sigillata con colla resistente agli agenti atmosferici.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) La parte in pietra intorno alla vasca da bagno \u00e8 realizzata con una cornice di sostegno in acciaio galvanizzato 4*4, e la pietra viene installata dopo che la malta cementizia con rete metallica \u00e8 stata dipinta e lasciata una porta nascosta per la manutenzione della pietra. Le specifiche e la direzione della porta di manutenzione devono soddisfare i requisiti di manutenzione.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Costruzione di chiusura della pietra per vasca da bagno 02<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"933\" height=\"628\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5682\" style=\"width:712px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02.png 933w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02-300x202.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02-768x517.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02-600x404.png 600w\" sizes=\"auto, (max-width: 933px) 100vw, 933px\" \/><\/a><figcaption class=\"wp-element-caption\">Costruzione di chiusura della pietra per vasca da bagno 02<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Bagno<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flusso del processo<br>Disposizione \u2192 Saldatura e installazione della cornice in ferro angolare \u2192 Installazione della rete metallica \u2192 Pitturazione con malta cementizia \u2192 Installazione della vasca da bagno \u2192 Installazione della pietra \u2192 Trattamento delle giunzioni delle lastre<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>1) Le giunzioni tra vasca da bagno e pietra vengono realizzate secondo il metodo di pressione della pietra sulla vasca. Il piano di lavoro in pietra viene tagliato secondo le dimensioni della vasca e scavato e bordato in fabbrica. Dopo la lavorazione completa della pietra, viene installato sul posto. La giunzione tra la pietra e la vasca da bagno \u00e8 sigillata con colla resistente agli agenti atmosferici;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Le parti in pietra intorno alla vasca da bagno sono realizzate con cornici di sostegno in acciaio galvanizzato 4*4. La pietra viene installata dopo che la malta cementizia con rete metallica \u00e8 stata dipinta e lasciata una porta nascosta per la manutenzione della pietra. Le specifiche e la direzione della porta di manutenzione devono soddisfare i requisiti di manutenzione.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Costruzione di chiusura della pietra per vasca da bagno 03<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"973\" height=\"681\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5683\" style=\"width:704px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03.png 973w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03-300x210.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03-768x538.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03-600x420.png 600w\" sizes=\"auto, (max-width: 973px) 100vw, 973px\" \/><\/a><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra<strong> <\/strong>Bagno<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flusso del processo<br>Disposizione \u2192 Saldatura e installazione della cornice in ferro angolare \u2192 Installazione della rete metallica \u2192 Pitturazione con malta cementizia \u2192 Installazione della vasca da bagno \u2192 Installazione della pietra \u2192 Trattamento delle giunzioni delle lastre<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>1) La giunzione tra vasca da bagno e pietra viene realizzata secondo il metodo di rendere piana la vasca e la pietra, e la giunzione tra pietra e vasca da bagno viene lasciata con 2 mm e sigillata con colla resistente agli agenti atmosferici;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Viene lasciata una porta nascosta per la manutenzione della pietra sul lato, e le specifiche e la direzione della porta di manutenzione devono soddisfare i requisiti di manutenzione.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Costruzione della flangia del piano di lavoro per armadi con davanzale a tutta finestra<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"867\" height=\"799\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5684\" style=\"width:641px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction.png 867w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction-300x276.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction-768x708.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction-600x553.png 600w\" sizes=\"auto, (max-width: 867px) 100vw, 867px\" \/><\/a><figcaption class=\"wp-element-caption\">Costruzione della flangia del piano di lavoro per armadi con davanzale a tutta finestra<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>decorazione in pietra Cucina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>La differenza di altezza tra il piano di lavoro in pietra artificiale e la soglia della finestra \u00e8 di 50\u201370 mm. Al fine di garantire l'effetto estetico complessivo, la barriera all'acqua del piano di lavoro in pietra artificiale deve essere collegata alla cornice della finestra.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Costruzione della flangia del piano di lavoro per armadi con soglia alta<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"885\" height=\"791\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5685\" style=\"width:676px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction.png 885w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction-300x268.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction-768x686.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction-600x536.png 600w\" sizes=\"auto, (max-width: 885px) 100vw, 885px\" \/><\/a><figcaption class=\"wp-element-caption\">Costruzione della flangia del piano di lavoro per armadi con soglia alta<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>Cucina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>La differenza di altezza tra il piano di lavoro in pietra artificiale e la soglia della finestra \u00e8 superiore a 80 mm; la barriera all'acqua del piano di lavoro in pietra artificiale \u00e8 convessa, e la soglia della finestra \u00e8 collegata con pietra artificiale o piastrelle da cucina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Costruzione della flangia del piano di lavoro per armadi con soglia bassa<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"872\" height=\"788\" title=\"14 costruttori dettagliati per la decorazione in pietra\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange.png\" alt=\"14 costruttori dettagliati per la decorazione in pietra\" class=\"wp-image-5686\" style=\"width:718px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange.png 872w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange-300x271.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange-768x694.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange-600x542.png 600w\" sizes=\"auto, (max-width: 872px) 100vw, 872px\" \/><\/a><figcaption class=\"wp-element-caption\">Costruzione della flangia del piano di lavoro per armadi con soglia bassa<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicabile a<br>soglie basse in cucina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Punti chiave<br>La soglia della finestra \u00e8 pi\u00f9 bassa rispetto al piano di lavoro in pietra artificiale. Dopo aver realizzato la barriera all'acqua del piano di lavoro in pietra artificiale, questa deve essere collegata al bordo della finestra oppure lasciare uno spazio operativo di almeno 100 mm prima di essere collegata alla soglia della finestra.<\/p>","protected":false},"excerpt":{"rendered":"<p>Stone dry hanging method construction Applicable tostone decoration public spaces such as indoor halls and elevator halls. Process flowPut control line \u2192 stone plate layout \u2192 pre-arrange stone \u2192 drive expansion bolts \u2192 install steel frame \u2192 install adjustment sheet \u2192 stone slot \u2192 stone installation \u2192 stone caulking treatment stone decoration Key points1) All [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":5695,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35,36],"tags":[3561,4093],"class_list":["post-5680","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogs","category-knowledge","tag-stone","tag-stone-decoration"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/posts\/5680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/comments?post=5680"}],"version-history":[{"count":0,"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/posts\/5680\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/media\/5695"}],"wp:attachment":[{"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/media?parent=5680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/categories?post=5680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hcenturystar.com\/it\/wp-json\/wp\/v2\/tags?post=5680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}