{"id":5680,"date":"2024-07-17T14:41:33","date_gmt":"2024-07-17T06:41:33","guid":{"rendered":"https:\/\/www.regalstoneworks.com\/?p=5680"},"modified":"2024-12-11T14:48:11","modified_gmt":"2024-12-11T06:48:11","slug":"decoration-en-pierre-14-schemas-detailles-des-noeuds-structurels-pour-une-analyse-approfondie","status":"publish","type":"post","link":"https:\/\/www.hcenturystar.com\/fr\/stone-decoration-14-detailed-structural-node-diagrams-for-in-depth-analysis\/","title":{"rendered":"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre"},"content":{"rendered":"<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Construction par m\u00e9thode de suspension s\u00e8che de la pierre<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"1012\" height=\"721\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5687\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction.png 1012w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction-300x214.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction-768x547.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/1.-Stone-dry-hanging-method-construction-600x427.png 600w\" sizes=\"auto, (max-width: 1012px) 100vw, 1012px\" \/><\/a><figcaption class=\"wp-element-caption\">1. Construction de la m\u00e9thode de suspension s\u00e8che dans la d\u00e9coration en pierre<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>la d\u00e9coration en pierre des espaces publics tels que les halls int\u00e9rieurs et les halls d'ascenseur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flux du processus<br>Mettre la ligne de contr\u00f4le \u2192 disposition des dalles de pierre \u2192 pr\u00e9-arranger la pierre \u2192 enfoncer les boulons d'expansion \u2192 installer la structure en acier \u2192 installer la feuille de r\u00e9glage \u2192 rainure pour la pierre \u2192 installation de la pierre \u2192 traitement du calfeutrage de la pierre<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s de la d\u00e9coration en pierre<br>1) Toutes les sp\u00e9cifications de l'acier r\u00e9pondent aux normes nationales ; les pi\u00e8ces galvanis\u00e9es \u00e0 chaud et soud\u00e9es sont antirouille. La qualit\u00e9 d'acier des pendentifs en pierre en acier inoxydable est \u00e9gale ou sup\u00e9rieure \u00e0 202, et des accessoires de connexion en acier de qualit\u00e9 304 sont requis pour les projets c\u00f4tiers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) L'\u00e9paisseur de la pierre doit \u00eatre sup\u00e9rieure \u00e0 20 mm. Pour les murs d'une hauteur inf\u00e9rieure \u00e0 2500 mm, il faut utiliser verticalement un profil\u00e9 en acier canal 5#, et horizontalement un angle en acier de 40 mm \u00d7 40 mm. L'espacement est d\u00e9termin\u00e9 selon la disposition des joints horizontaux de la pierre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3) Pour les murs d'une hauteur sup\u00e9rieure \u00e0 2500 mm, il faut utiliser verticalement un profil\u00e9 en acier canal 8#, et horizontalement un angle en acier de 50 mm \u00d7 5 mm. L'espacement est d\u00e9termin\u00e9 selon la disposition des joints horizontaux de la pierre.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Disposition en forme de U des rainures des pierres murales<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"671\" height=\"821\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5688\" style=\"width:413px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone.png 671w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone-245x300.png 245w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/2.U-shaped-groove-layout-of-wall-stone-600x734.png 600w\" sizes=\"auto, (max-width: 671px) 100vw, 671px\" \/><\/a><figcaption class=\"wp-element-caption\">Disposition en forme de U des rainures des pierres murales<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Halls int\u00e9rieurs, halls d'ascenseur, toilettes et autres murs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>Les joints horizontaux des murs en pierre doivent \u00eatre dispos\u00e9s en fonction de la hauteur de la ligne de vue humaine.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">L'angle ext\u00e9rieur de la pierre murale est ferm\u00e9<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"564\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-1024x564.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5697\" style=\"width:586px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-1024x564.png 1024w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-300x165.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-768x423.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed-600x330.png 600w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/3.The-outer-corner-of-the-wall-stone-is-closed.png 1088w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">L'angle ext\u00e9rieur de la pierre murale est ferm\u00e9<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Halls int\u00e9rieurs, halls d'ascenseur, toilettes et autres murs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>1) Les angles ext\u00e9rieurs de la pierre murale doivent \u00eatre assembl\u00e9s en diagonale \u00e0 45\u00b0 ;<br>2) Une fois toutes les pierres murales pos\u00e9es, il faut pr\u00e9parer une colle marbr\u00e9e de la m\u00eame couleur que la pierre pour le jointoiement, et le jointoiement doit \u00eatre serr\u00e9.<br>3) Les angles ext\u00e9rieurs de la pierre murale sont trait\u00e9s selon les exigences de conception.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Les angles int\u00e9rieurs de la pierre murale<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"996\" height=\"653\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5689\" style=\"width:508px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone.png 996w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone-300x197.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone-768x504.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/4.The-inner-corners-of-the-wall-stone-600x393.png 600w\" sizes=\"auto, (max-width: 996px) 100vw, 996px\" \/><\/a><figcaption class=\"wp-element-caption\">Les angles int\u00e9rieurs de la pierre murale<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Halls int\u00e9rieurs, halls d'ascenseur, toilettes et autres murs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>Lorsqu'il existe des joints horizontaux sur le mur en pierre (tels que les joints en V et les rainures), les angles int\u00e9rieurs doivent \u00eatre \u00e0 45\u00b0 (l'angle est l\u00e9g\u00e8rement inf\u00e9rieur \u00e0 45\u00b0 pour faciliter l'assemblage) et doivent \u00eatre trait\u00e9s en usine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Porte d'inspection pour la pierre<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"696\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-1024x696.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5690\" style=\"width:484px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-1024x696.png 1024w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-300x204.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-768x522.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door-600x408.png 600w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/5.Stone-inspection-door.png 1030w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Porte d'inspection pour la pierre<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Halls d'ascenseur int\u00e9rieurs, halls, couloirs, etc.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>1) Un angle en acier galvanis\u00e9 \u00e0 chaud est requis pour les portes cach\u00e9es en pierre. La taille de l'angle en acier et du roulement \u00e0 billes est choisie en fonction du poids mort du corps de la porte, et les parties soud\u00e9es sont trait\u00e9es contre la rouille ;<br>2) Les surfaces coup\u00e9es de la pierre, les bords de la porte et les bords du cadre doivent \u00eatre polis lors de la suspension ou de l'installation de la pierre, et la surface du cadre en acier est scell\u00e9e avec une plaque anti-humidit\u00e9 ;<br>3) Afin d'\u00e9viter que la porte ne heurte le cadre, ce qui endommagerait la pierre, une cha\u00eene de limitation doit \u00eatre install\u00e9e entre la porte et le cadre.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Installation du bassin avec cadre en acier<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><br>Applicable \u00e0<br>d\u00e9coration en pierre Bassins sous-meubles dans la salle de bain.<br>Flux du processus<br>Disposition \u2192 Installation des canalisations \u2192 Soudage du cadre de base \u2192 Fixation du cadre de base au mur \u2192 Traitement en usine de la pierre \u2192 Fixation du bassin \u2192 Installation sur site<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"832\" height=\"791\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5691\" style=\"width:553px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation.png 832w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation-300x285.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation-768x730.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/6.Steel-frame-basin-installation-600x570.png 600w\" sizes=\"auto, (max-width: 832px) 100vw, 832px\" \/><\/a><figcaption class=\"wp-element-caption\">Installation du bassin avec cadre en acier<\/figcaption><\/figure>\n<\/div>\n\n\n<ol class=\"wp-block-list\" start=\"6\">\n<li><\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>1) Le cadre en fer du bassin doit utiliser un angle en acier galvanis\u00e9 conforme aux normes nationales, et les parties soud\u00e9es doivent \u00eatre antirouille ;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Afin de faciliter le d\u00e9montage et l'entretien du bassin, celui-ci est fix\u00e9 sur le composant fixe, et le composant fixe ainsi que le socle en pierre sont fix\u00e9s \u00e0 l'aide de boulons en acier inoxydable ou galvanis\u00e9s. L'arri\u00e8re du socle et l'arri\u00e8re du plan de travail doivent \u00eatre rugueux et fix\u00e9s avec de la colle marbr\u00e9e. La connexion entre le bassin et le composant fixe doit \u00eatre r\u00e9alis\u00e9e avec des patins en caoutchouc, et le bassin ainsi que le bord inf\u00e9rieur du plan de travail sont scell\u00e9s avec une colle r\u00e9sistante aux intemp\u00e9ries.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Installation du bassin sous-plan de travail<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"675\" height=\"782\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5692\" style=\"width:433px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation.png 675w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation-259x300.png 259w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/7.Under-counter-counter-basin-installation-600x695.png 600w\" sizes=\"auto, (max-width: 675px) 100vw, 675px\" \/><\/a><figcaption class=\"wp-element-caption\">Installation du bassin sous-plan de travail<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Halls int\u00e9rieurs, halls d'ascenseur, toilettes et autres murs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flux du processus<br>Disposition \u2192 Installation des canalisations \u2192 Fabrication en usine du cadre en bois \u2192 Traitement en usine de la pierre \u2192 Fixation du bassin \u2192 Installation combin\u00e9e<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>Afin de faciliter le d\u00e9montage et l'entretien du bassin, celui-ci est fix\u00e9 sur le composant fixe, et le composant fixe ainsi que la face inf\u00e9rieure de l'armoire sous le plan de travail sont fix\u00e9s \u00e0 l'aide de vis traversantes de 8 mm. La connexion entre le bassin et le composant fixe doit \u00eatre scell\u00e9e avec des patins en caoutchouc, et le bord inf\u00e9rieur du bassin ainsi que le plan de travail sont scell\u00e9s avec une colle r\u00e9sistante aux intemp\u00e9ries.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">La jonction entre la cloison en verre et le mur en marbre de la salle de bain<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"547\" height=\"718\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5693\" style=\"width:438px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall.png 547w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/8.The-intersection-of-bathroom-glass-partition-and-marble-wall-229x300.png 229w\" sizes=\"auto, (max-width: 547px) 100vw, 547px\" \/><\/a><figcaption class=\"wp-element-caption\">La jonction entre la cloison en verre et le mur en marbre de la salle de bain<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Salle de bain, salle de douche, cloison en verre, etc.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>1) Avant d'installer le verre de la salle de douche, ins\u00e9rer une rainure en acier inoxydable en forme de \u201c U \u201d entre deux morceaux de pierre et la fixer avec de la colle AB ou de la colle marbr\u00e9e, ins\u00e9rer le verre dans la rainure et appliquer du silicone transparent anti-moisissure au niveau de la jointure ;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Le diam\u00e8tre int\u00e9rieur de l'acier inoxydable en forme de U est 2-4 mm plus large que l'\u00e9paisseur du verre, profond de 15 mm \u00e0 18 mm, et l'\u00e9paisseur de la paroi est d'au moins 1,2 mm ;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">3) Le verre doit \u00eatre bord\u00e9 sur tous ses c\u00f4t\u00e9s.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Installation des \u00e9l\u00e9ments int\u00e9gr\u00e9s pour les portes de la salle de douche<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"845\" height=\"746\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5694\" style=\"width:474px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors.png 845w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors-300x265.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors-768x678.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/9.Installation-of-embedded-parts-for-shower-room-doors-600x530.png 600w\" sizes=\"auto, (max-width: 845px) 100vw, 845px\" \/><\/a><figcaption class=\"wp-element-caption\">Installation des \u00e9l\u00e9ments int\u00e9gr\u00e9s pour les portes de la salle de douche<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Salle de bain et salle de douche.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>Lors de l'installation de la porte de la salle de douche dans la salle de bain, il est n\u00e9cessaire d'ins\u00e9rer la tige en fer avant l'installation de la pierre et de la fixer directement au mur (le mur a\u00e9r\u00e9 rempli de sable doit \u00eatre renforc\u00e9 par des tiges viss\u00e9es traversantes).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Construction de niche de salle de bain<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"844\" height=\"745\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5695\" style=\"width:452px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction.png 844w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction-300x265.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction-768x678.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/10.Bathroom-niche-construction-600x530.png 600w\" sizes=\"auto, (max-width: 844px) 100vw, 844px\" \/><\/a><figcaption class=\"wp-element-caption\">Construction de niche de salle de bain<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Construction de murs, de pierres et de carrelages dans les salles de bain et les cuisines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>La hauteur de la niche de salle de bain doit \u00eatre d\u00e9termin\u00e9e en fonction de la disposition des pierres ou des carrelages muraux. La hauteur doit \u00eatre au niveau du joint horizontal, et un chanfrein ou une rainure identique \u00e0 celui du joint horizontal doit \u00eatre r\u00e9alis\u00e9.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Construction de fermeture en pierre de la baignoire 01<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"943\" height=\"617\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5696\" style=\"width:593px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01.png 943w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01-300x196.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01-768x502.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-01-600x393.png 600w\" sizes=\"auto, (max-width: 943px) 100vw, 943px\" \/><\/a><figcaption class=\"wp-element-caption\">Construction de fermeture en pierre de la baignoire 01<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Salles de bain.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flux du processus<br>Disposition \u2192 Soudage et installation du cadre en angle en fer \u2192 Installation du treillis m\u00e9tallique \u2192 Peinture au mortier de ciment \u2192 Pose de la pierre \u2192 Installation de la baignoire<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>1) La jonction entre la baignoire et la pierre est r\u00e9alis\u00e9e selon la m\u00e9thode de pression de la pierre sur le bord de la baignoire. Le plan de travail en pierre est d\u00e9coup\u00e9 selon la taille de la baignoire, creus\u00e9 et bord\u00e9. Apr\u00e8s le traitement en usine, il est install\u00e9 sur place. La jonction entre la pierre et la baignoire est scell\u00e9e avec une colle r\u00e9sistante aux intemp\u00e9ries.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) La partie en pierre autour de la baignoire est constitu\u00e9e d'un cadre de support en angle galvanis\u00e9 4*4, et la pierre est install\u00e9e apr\u00e8s la peinture du mortier de ciment du treillis m\u00e9tallique et laisser une porte cach\u00e9e pour l'entretien de la pierre. Les sp\u00e9cifications et la direction de la porte d'entretien doivent r\u00e9pondre aux exigences d'entretien.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction de fermeture en pierre de la baignoire 02<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"933\" height=\"628\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5682\" style=\"width:712px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02.png 933w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02-300x202.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02-768x517.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-02-600x404.png 600w\" sizes=\"auto, (max-width: 933px) 100vw, 933px\" \/><\/a><figcaption class=\"wp-element-caption\">Construction de fermeture en pierre de la baignoire 02<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Salle de bain<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flux du processus<br>Disposition \u2192 Soudage et installation du cadre en angle en fer \u2192 Installation du treillis m\u00e9tallique \u2192 Peinture au mortier de ciment \u2192 Installation de la baignoire \u2192 Pose de la pierre \u2192 Traitement des joints de plaques<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>1) Les joints entre la baignoire et la pierre sont r\u00e9alis\u00e9s selon la m\u00e9thode de pression de la pierre sur la baignoire. Le plan de travail en pierre est d\u00e9coup\u00e9 selon la taille de la baignoire, creus\u00e9 et bord\u00e9 en usine. Apr\u00e8s le traitement complet de la pierre, elle est install\u00e9e sur place. La jonction entre la pierre et la baignoire est scell\u00e9e avec une colle r\u00e9sistante aux intemp\u00e9ries ;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Les parties en pierre autour de la baignoire sont constitu\u00e9es de cadres de support en angle galvanis\u00e9 4*4. La pierre est install\u00e9e apr\u00e8s la peinture du mortier de ciment du treillis m\u00e9tallique, et une porte cach\u00e9e pour l'entretien de la pierre est laiss\u00e9e. Les sp\u00e9cifications et la direction de la porte d'entretien doivent r\u00e9pondre aux exigences d'entretien.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Construction de fermeture en pierre de la baignoire 03<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"973\" height=\"681\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5683\" style=\"width:704px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03.png 973w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03-300x210.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03-768x538.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/11.Bathtub-stone-closing-construction-03-600x420.png 600w\" sizes=\"auto, (max-width: 973px) 100vw, 973px\" \/><\/a><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre<strong> <\/strong>Salle de bains<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Flux du processus<br>Disposition \u2192 Soudage et installation du cadre en angle en fer \u2192 Installation du treillis m\u00e9tallique \u2192 Peinture au mortier de ciment \u2192 Installation de la baignoire \u2192 Pose de la pierre \u2192 Traitement des joints de plaques<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>1) La jonction entre la baignoire et la pierre est r\u00e9alis\u00e9e selon la m\u00e9thode consistant \u00e0 rendre plat la baignoire et la pierre, et le joint entre la pierre et la baignoire est laiss\u00e9 avec 2 mm et scell\u00e9 avec une colle r\u00e9sistante aux intemp\u00e9ries ;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">2) Une porte cach\u00e9e pour l'entretien de la pierre est laiss\u00e9e sur le c\u00f4t\u00e9, et les sp\u00e9cifications et la direction de la porte d'entretien doivent r\u00e9pondre aux exigences d'entretien.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"font-size:22px\">Construction de la bride de comptoir pour armoire de rebord de fen\u00eatre enti\u00e8re<\/h2>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"867\" height=\"799\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5684\" style=\"width:641px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction.png 867w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction-300x276.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction-768x708.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/12.Full-window-sill-cabinet-countertop-flange-construction-600x553.png 600w\" sizes=\"auto, (max-width: 867px) 100vw, 867px\" \/><\/a><figcaption class=\"wp-element-caption\">Construction de la bride de comptoir pour armoire de rebord de fen\u00eatre enti\u00e8re<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>d\u00e9coration en pierre Cuisine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>La diff\u00e9rence de hauteur entre le plan de travail en pierre artificielle et le rebord de fen\u00eatre est de 50 \u00e0 70 mm. Afin d'assurer l'effet esth\u00e9tique global, la barri\u00e8re d'eau du plan de travail en pierre artificielle doit \u00eatre raccord\u00e9e au cadre de la fen\u00eatre.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction de la bride de plan de travail pour armoire \u00e0 haut rebord de fen\u00eatre<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"885\" height=\"791\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5685\" style=\"width:676px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction.png 885w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction-300x268.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction-768x686.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/13.High-window-sill-cabinet-countertop-flange-construction-600x536.png 600w\" sizes=\"auto, (max-width: 885px) 100vw, 885px\" \/><\/a><figcaption class=\"wp-element-caption\">Construction de la bride de plan de travail pour armoire \u00e0 haut rebord de fen\u00eatre<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>Cuisine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>La diff\u00e9rence de hauteur entre le plan de travail en pierre artificielle et le rebord de fen\u00eatre est sup\u00e9rieure \u00e0 80 mm ; la barri\u00e8re d'eau du plan de travail en pierre artificielle est convexe, et le rebord de fen\u00eatre est raccord\u00e9 \u00e0 de la pierre artificielle ou \u00e0 des carrelages de cuisine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction de la bride de plan de travail pour armoire \u00e0 bas rebord de fen\u00eatre<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange.png\" rel=\"nofollow noopener\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" width=\"872\" height=\"788\" title=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" src=\"https:\/\/www.regalstoneworks.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange.png\" alt=\"14 constructeurs d\u00e9taill\u00e9s de d\u00e9coration en pierre\" class=\"wp-image-5686\" style=\"width:718px;height:auto\" srcset=\"https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange.png 872w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange-300x271.png 300w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange-768x694.png 768w, https:\/\/www.hcenturystar.com\/wp-content\/uploads\/2024\/07\/14.Construction-of-low-window-sill-cabinet-countertop-flange-600x542.png 600w\" sizes=\"auto, (max-width: 872px) 100vw, 872px\" \/><\/a><figcaption class=\"wp-element-caption\">Construction de la bride de plan de travail pour armoire \u00e0 bas rebord de fen\u00eatre<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Applicable \u00e0<br>Bas rebords de fen\u00eatre dans la cuisine.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Points cl\u00e9s<br>Le rebord de fen\u00eatre est plus bas que le plan de travail en pierre artificielle. Apr\u00e8s r\u00e9alisation de la barri\u00e8re d'eau du plan de travail en pierre artificielle, celle-ci doit \u00eatre raccord\u00e9e au bord de la fen\u00eatre ou laisser un espace d'au moins 100 mm avant d'\u00eatre raccord\u00e9e au rebord de fen\u00eatre.<\/p>","protected":false},"excerpt":{"rendered":"<p>Stone dry hanging method construction Applicable tostone decoration public spaces such as indoor halls and elevator halls. Process flowPut control line \u2192 stone plate layout \u2192 pre-arrange stone \u2192 drive expansion bolts \u2192 install steel frame \u2192 install adjustment sheet \u2192 stone slot \u2192 stone installation \u2192 stone caulking treatment stone decoration Key points1) All [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":5695,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35,36],"tags":[3561,4093],"class_list":["post-5680","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogs","category-knowledge","tag-stone","tag-stone-decoration"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/posts\/5680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/comments?post=5680"}],"version-history":[{"count":0,"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/posts\/5680\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/media\/5695"}],"wp:attachment":[{"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/media?parent=5680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/categories?post=5680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hcenturystar.com\/fr\/wp-json\/wp\/v2\/tags?post=5680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}